
This note covers the first eight months of 2026 across our tracked CCUS pipeline: what reached FID, what was cancelled, and what the projects that advanced had to have in place first. The pattern is consistent across regions. Storage keeps being sanctioned, capture does not, and the projects that clear do so on a signed anchor volume rather than on the value of a credit.